CCTV SURVEILLANCE ACCESS CONTROL CORPORATE OFFICE

Multi-Building Surveillance & Access Control Rollout

A full CCTV, biometric access and IP-PABX deployment across a three-building corporate campus in Lahore — delivered in six weeks with zero operational downtime.

PROJECT HERO IMAGE · 1600×680
ClientNishat Group — Lahore Office
LocationGulberg III, Lahore
Duration6 Weeks
CategoryCorporate / Commercial
Completed2026
Challenge

Three buildings, no unified security

Each building ran separate, aging analog CCTV with no shared access control, making it impossible to track staff movement or respond to incidents in real time.

Solution

One integrated IP network

We designed a single NVR network across all three buildings with biometric + RFID access control at every entry point, tied into one IP-PABX communication system.

Result

Full visibility, one dashboard

Security and HR teams now monitor all entrances and attendance from a single dashboard, with zero disruption to daily office operations during rollout.

0Cameras Installed
0Access Points Secured
0Buildings Covered
0%Operational Downtime
Scope of Work

What we delivered

  • Site survey across 3 buildings and rooftop access points
  • 64 IP cameras with centralized NVR storage
  • Biometric + RFID access control at 12 entry points
  • IP-PABX exchange linking all three buildings
  • Staff training and handover documentation
  • 12-month maintenance and support agreement
Technology Used
Hikvision IP Cameras ZKTeco Biometric Terminals NVR 64-Channel IP-PABX Exchange RFID Access Cards
Project Gallery

On-site photos

Image
Project Timeline

How the rollout happened

Week 1

Survey & Design

Site walkthroughs across all 3 buildings, network and cabling plan finalized.

Week 2–3

Cabling & Camera Install

Structured cabling laid, 64 cameras mounted and aligned.

Week 4

Access Control Rollout

Biometric and RFID terminals installed at 12 entry points, enrolled staff data.

Week 5

IP-PABX Integration

Telephony exchange linked across buildings, tested extension routing.

Week 6

Testing & Handover

Full system test, staff training session, documentation delivered.

"3D Solutions assessed our site, proposed a tailored biometric solution, and delivered it within the agreed timeline. The face recognition system has significantly improved our security and staff attendance tracking."

Mariam Khalid — Administration Director
More Projects

Related work

Have a similar site in mind?

Get a free assessment and a proposal built around your buildings, not a generic package.

Schedule a Site Visit →